New Homes, ADUs & Additions
New Construction Plumbing in Hayward & the Tri-Valley
Rough-in, top-out and finish plumbing for new homes, ADUs and additions.
What's Included
What We Plumb on a New Build
Rough-In
- ✓ Underground drain, waste and vent lines
- ✓ Water supply lines run to each fixture location
- ✓ Gas piping to appliance locations
- ✓ Underground and rough plumbing inspections
Top-Out
- ✓ Drain, waste and vent piping through the framing
- ✓ Supply lines, stub-outs and valves
- ✓ Tub and shower valves set
- ✓ Water and pressure tests for the top-out inspection
Finish
- ✓ Fixtures, faucets and toilets set
- ✓ Water heater installation
- ✓ Appliance and gas connections
- ✓ Final plumbing inspection
Service Connections
- ✓ Building sewer from the house to the sewer connection
- ✓ Cleanouts and backwater valves where required
- ✓ Water service from the meter to the house
- ✓ Gas piping from the meter to the house
Our Process
How It Works
Review the Plans
We go through the plans with you or your GC and check the fixture layout and the water, sewer and gas connections. For ADUs and additions, we camera the existing sewer and you get the video.
Estimate and Schedule
You get a written estimate, and we line up our work with the framing and the other trades.
Permits and Rough-In
We handle the permits and schedule the inspections for the plumbing we're contracted for, then rough in and top out.
Finish and Final
We set fixtures, connect the services, test everything and coordinate the final plumbing inspection.
Related Services
Other Services You Might Need
Service Area
Serving Hayward and the Tri-Valley
Based in Hayward, serving Alameda County. Not sure we cover your street? Contact us.
FAQ
Frequently Asked Questions
Yes. We work from the approved plans, keep the GC posted on where the plumbing stands, and line up our work with framing and the other trades so the plumbing is ready when each inspection comes up.
Rough-in is the underground work: drain and water lines set before the slab is poured or the floor goes in. Top-out is everything that runs through the framing before the walls are closed, like drain, waste and vent pipes, supply lines and valves. Finish is the last stage: fixtures, faucets, the water heater and appliance connections. There's usually an inspection at each stage.
Often, yes. It depends on the size and condition of the existing lines and on what the city and the utility require. We camera the existing sewer, check the water service, and tell you whether the ADU can share them or needs its own.
We do the plumbing on your property and coordinate with whoever provides the service, which depends on the address. In Dublin, DSRSD provides both water and sewer. In Pleasanton, the City runs both. In Livermore, water comes from either Livermore Municipal Water or Cal Water. In Hayward, most properties get water and sewer from the City, but some are on EBMUD water or the Oro Loma Sanitary District sewer. We confirm the providers for your lot early so their requirements are part of the plan.
Yes. We run gas piping from the meter to the house and to each appliance, and we're PG&E OQ qualified. PG&E sets the gas meter, and we coordinate with them on the connection.
Planning a New Home, ADU or Addition?
Call or send a request to talk through the plumbing scope, the schedule and the permits.