Call anytime. Serving Hayward, Dublin, Pleasanton & LivermoreCall anytime

Licensed & Bonded CA Lic. #1084094 C-36 Plumbing

Utility Trenching in Pleasanton, CA

Gas and electric service trenches, conduit for panel upgrades, ADUs and EV chargers, and PG&E service connections on your property.

PG&E OQ Qualified Permits Handled

What we trench in Pleasanton

We're a C-36 plumbing contractor based in Hayward and PG&E OQ qualified for gas and electrical work. In Pleasanton our trenching is on private property, from the meter or PG&E's service point to your house, ADU or new building.

Service upgrades

The trench for a bigger electric service when a panel upgrade, heat pump or EV charger needs more power from PG&E.

Gas service lines

New or upsized gas lines from the meter to the house or an ADU. See our gas line services.

ADU and garage conduit

Trenching for conduit to a backyard ADU, an addition or a detached garage, sized for what you plan to run there.

Water lines in the same trench

When the run also carries water, we lay it in the same dig. See our water line services.

Who signs off on a trench in Pleasanton

Building permit

Building and Safety Division at the Permit Center, 200 Old Bernal Avenue. A permit comes first for any electrical, gas or plumbing install, alteration or repair.

City of Pleasanton: Permits, Forms and Fees

Water

The City of Pleasanton runs the water system, and it currently gets all of its water from Zone 7, the Tri-Valley wholesaler.

City of Pleasanton: About Our Water

Sewer

The City maintains the sewer collection system. Most of it is treated at DSRSD's regional plant in Dublin, while Ruby Hill's goes to Livermore's plant.

City of Pleasanton: Sewer Service Programs

Street trenches

City specs say a trench in an existing street gets temporary or permanent paving on the working day it's backfilled, and permanent paving inside 14 calendar days.

City of Pleasanton: Standard Specifications (2024)

How deep a service trench goes

PG&E's Greenbook calls for at least 24 inches of cover over a residential electric service, measured from the top of the conduit to finished grade. With bedding and sweeps, the trench usually ends up around 30 inches deep.

For gas, PG&E's gas design standard sets at least 24 inches of cover over a service in a gas-only trench. A joint trench follows PG&E's joint trench standard, and PG&E can ask for more cover where conditions call for it. We confirm the depth on the PG&E design before we dig.

Pleasanton trenching questions

Yes. Pleasanton requires a permit from the Building and Safety Division before anyone installs, alters, repairs or replaces an electrical, gas or plumbing system. The Permit Center is at 200 Old Bernal Avenue, next to the City Council Chambers. We pull the permits for the work we do.

Only if part of it is in the public right of way. Pleasanton Engineering issues encroachment permits for excavating or trenching there, including utility work on the street. If you are not sure, the City says to call Engineering at (925) 931-5650.

Under PG&E Rule 16, the property owner is responsible for the trenching, backfill and permit fees for a new service extension. PG&E designs the service and inspects the work. That digging is the part we do, along with the inspection scheduling.

It depends on the property. Pleasanton requires a backflow device on all non-residential water connections, and on homes where the City has found a hazard, like an on-site well, a booster pump or an unprotected fire sprinkler system.

Planning a trench in Pleasanton?

Send us the plan or tell us what needs power or gas. We'll walk the site and send a written estimate.

What customers say

Read all 48 reviews on Yelp See our Google reviews

Call Now Get Estimate